Assembly time for expandable container houses ranges from 1–3 days for basic units and 3–7 days for custom or multi-story models. Most come pre-fabricated with pre-installed plumbing/electrical, so on-site work focuses on unfolding the structure (via manual cranks or hydraulic systems), securing the frame, and connecting utilities. A 2-person team can set up a 300 sq ft unit in under 8 hours. Larger models (600+ sq ft) or those with add-ons (decks, solar panels) may take longer but still beat traditional construction (4–8 weeks). Manufacturers often offer installation services for faster, hassle-free setup.
![]()